28 إدارة العقود | الدورة المتقدمة في إدارة العقود
 
هاتف : 00971 4 4333654
البريد الالكتروني:
 
 
إدارة العقود
 
  الدورة المتقدمة في إدارة العقود
   
 

FIDIC Advanced Contract Administration - Course III

The course will go through the Project life cycle from the initiation stage of the Project, the Project procurement methodology and choices, the Contract award, the ongoing financial and technical controls, till the successful closing out of the Project.

 

Course Outlines

Project Procurement Methodology

Project Feasibility

Project Time Line

Identifying the Project Risks

Lump Sum, Re-measured, or Design and Build

Project Initiation

Procurement Of Consultancy Services

Consultant’s scope

Consultant’s Authority

Design review and Comments

Design changes

Preparation of the Contract Documents

General Conditions of Contract

Particular Conditions

Appendix to Tender

BOQ

Templates to be used

Tender Stage

Prequalification of Contractors

Letter of Interest

Floating of Tender

Responding to Tenderers queries, Addendums

Tender Submission

Tender Evaluation

Contract Award

Contract Award and Kick-off meeting

Commencement Date

Engineer’s delegation of duties and authorities

Contractor’s Representative

Contractor’s Mobilization

Advance Payment Security

Performance Security and Return of Tender Bonds

Insurances

Breakdowns of Lump Sums and Unit Rates

Statutory Approvals and Permits

Access to and possession of site

Issue for Construction drawings

Preparation and signing of Contract

Copies of signed Contract

Continuing Validity of Securities and Insurance Performance Security

 

Project Progress

Quality Assurance and Control

Compliance with Local Law

Progress Meetings and Commercial Meetings

Daily, Weekly and Monthly Reports

Progress Reports

Project Logs

Contractor’s Personnel and Equipment

Subcontractors and Suppliers Management

Nominated Subcontractors

Samples and Testing of Materials, Workmanship and Plant

Works Inspection, Testing & Acceptance

Samples and Testing of Materials, Workmanship and Plant

Works Inspection, Testing & Acceptance

Unacceptable Works, Defects Notification and remedies

Defects Notification

Acceptance of non-complying Works with payment deductions

Remedies

Engineer’s Instructions

Bill of Quantities and Unit Prices

Provisional Sums

Variations

General requirements

Employer’s pre-approval

Contractor’s compliance

Variations after Substantial Completion of the Works

Valuation of Variations

Principles of valuation

Adjustments arising from Variations in Quantities

Incorporating Variations into the Bill of Quantities by establishing new BoQ Items for

Variation Orders

Value Engineering

Daywork

Work Progress

Works programme and cash flow revisions

Submission of work programme

Works programme revisions

Cash flow revisions

Contractor’s slow progress

Remedies to comply with Time for Completion

Increased working hours

Works Suspensions

Suspension of Works by the Engineer

Suspension of Works by the Contractor

Claims: Contractor’s and Employer’s

Documentation, determination and evaluation of Claims

Documentation of Claims

Procedures for Determination

Due consultation

Limits of the Engineer’s Authority

Delays, Extension of Time for Completion and associated costs

Grounds for Extension of Time

Procedures for Extension of Time Claims

Costs associated with Extension of Time

Responsibility for Delay affects Entitlement to Costs

Loss of Profit

Liquidated Damages and Bonus

Payments

Measurement of Works

Valuation of Plant and Materials intended for the Works

Contractor’s Interim Payment Statements

Interim Payment Certificates

General Requirements

Repayment of Advance Payment

Deductions for Retention

Payment of Retention Money

Security for Retention Money

Interim Payments

Delayed Payments

Overview

Interest (financing charges) on Late Payments

 

Project Closure

Taking Over The Works

Substantial Completion

Taking-Over Certificate

Taking-Over Certificate for the Whole of the Works

Taking-Over Certificates for Parts of the Works

Form of Taking-Over Certificate

Inspection at Completion and the Snagging List

Contractor’s Statement at Completion

Interim Payment Certificate at Completion

Engineer’s Interim Payment Certificate at Completion

Supplement Report to Interim Payment Certificate at Completion

Interim Payment at Completion

Contract Termination

Termination by Employer arising from Contractor’s Default

Termination by Contractor arising from Employer’s Default

Termination resulting from Force Majeure

Employer’s Termination for Convenience

 

Defect Liability Period

Defects Liability Period

Completion of Remaining Works and Rectification of Defects

Inspections and Notification of Defects

Cost of Rectifying Defects and Damage

Remedies for Non-Performance in Defects Liability Period

Extension of Defects Liability Period

Further Tests

Final Acceptance of Works

Defects Liability Certificate

Clearance of Site

Contractor’s Final Statement

Contractor’s Discharge

Final Payment Certificate

Final Payment

 

Disputes and Dispute Resolution

Contract Provisions

Engineer’s Decision

Dispute Adjudication Board

Amicable Settlement

Arbitration

 

 
تسجيل
 
 
 
  برامج أخرى
 
  العلوم العقارية
  العلوم الهندسية
  إدارة العقود
 
  البرامج القادمة
 
الدليل لفهم شروط فيديك في العقود 1999

تم تصميم الدورة التدريبية لتوفير إرشادات عملية للأشخاص الذين يشاركون في الإدارة أو إدارة المشاريع التي تتطلب استخدام أشكال فيديك في العقود. ويشمل المساق التخصصات الإدارية والإجراءات في مرحلة ما قبل العقد للمشروع واختيار النموذج المناسب لعقد الفيديك.

 
 
 
دبلوم إدارة العقارات

 إننا في هذا الدبلوم نقوم بتزويد المشاركين بالعلوم العقارية والمعرفة والخبرات اللازمة لتمكينهم من ممارسة العمل في القطاع العقاري باحتراف وبشكل علمي ممنهج ومدروس بغية تأهيلهم لتحقيق أفضل النتائج للوصول لأعلى المستويات من خلال المعرفة التامة والدراية الشاملة بهذا المجال. 

 

 
 
 
الأوامر التغيرية والمطالبات في العقود

الأوامر التغيرية والمطالبات في العقود  -  ( English  )

 
 
 
دبلوم التقييم والتثمين العقاري

يقدم هذا البرنامج شرحاً مفصلاً عن علم التثمين العقاري وبيان دوره ومهمته في المنظومة الإقتصادية والعقارية، وسيزود المشاركين بالمعرفة اللازمة لممارسة مهنة التثمين العقاري من خلال الإطلاع على أسس وطرق وإشتراطات التثمين العقاري.

 
 
 
دبلوم التطوير العقاري

يقدم البرنامج تحليل عام لمفهوم التطوير العقاري الحديث مع تقديم أمثلة عملية في النواحي المالية والهندسية والتسويقية المتعلقة بالتطويروتحليل إختيار البديل الإستثماري الأكثر جدوى إقتصادية للمستثمر، إضافة إلى هيكلة وإدارة شركة  التطوير العقاري والتخطيط للمشروع وتنفيذه ورقابته وتقييم عملياته.

 
 
 
الدورة المتقدمة في إدارة العقود

الدورة المتقدمة في إدارة العقود - ( English  )

 
 
 
 
إرسال إستفسار   خارطة موقع الأكاديمية إتصل بنا
الإسم

View Larger Map

الأكاديمية الإدارية والعقارية ، قرية المعرفة المبنى رقم 3 مكتب رقم 07 صندوق بريد : 500756
دبي - الإمارات العربية المتحدة

هاتف : 00971 4 4333654
فاكس : 00971 4 3686888
البريد الإلكتروني : badr@mreacademy.com
الموقع الإلكتروني : www.mreacademy.com


البريد الإلكتروني
نص الإستفسار
 
جميع الحقوق محفوظة للأكاديمية الإدارية والعقارية
     
     
مدعوم من: سوم للتكنولوجيا